294 Quantum Delay Claims and Dispute jobs
Quantum Delay Claims and Dispute Keywords: expert witness Page 13 of 30 « 1 ... 12 13 14 ... 30 »-
Associate Director role in Dubai leading delay analysis on major international construction disputes.
Read more » -
Senior Consultant opportunity in Dubai specialising in delay analysis and construction dispute resolution.
Read more » -
A fantastic opportunity for an engineer to specialise their career in delay analysis and dispute resolution with leading international expert witness consultancy.
Read more » -
An exciting opportunity for an ambitious Associate Director – Quantum based in Leeds to develop, lead and deliver construction disputes and quantum services across the North of England.
Read more » -
An excellent opportunity for a Senior Delay Analyst to join a growing, London-based specialist claims and disputes consultancy.
Read more » -
A prestigious opportunity for an experienced Director – Quantum based in Leeds to lead, grow and deliver high-level construction disputes and quantum services across the North of England and beyond.
Read more » -
A fantastic opportunity for a Quantum Expert to join an expanding specialist claims and disputes consultancy. This is a remote position, and the Quantum Expert can be based anywhere in the UK.
Read more » -
A fantastic opportunity for a Quantum Associate Director to join an expanding specialist claims and disputes consultancy. This is a remote position, and the Associate Director can be based anywhere in the UK.
Read more » -
An excellent opportunity for a Quantity Surveyor to specialise as a Quantum Consultant within a leading, specialist claims and disputes consultancy.Although the consultancy is based in Central London, they are happy to consider suitable applicants based in Manchester to work remotely with occassional travel to the London office.
Read more » -
An excellent opportunity for a Senior Delay Analyst to join a growing, specialist claims and disputes consultancy.Although the consultancy is based in Central London, they are happy to consider suitable applicants based in Manchester to work remotely with occasional travel to the London office.
Read more »