101 Quantum Delay Claims and Dispute jobs
Quantum Delay Claims and Dispute Keywords: LONDON £60,000 to £149,999 Page 4 of 11 « 1 2 3 4 5 ... 11 »-
Senior Chartered Building Surveyor Expert Witness role focused on defect analysis and construction disputes.
Read more » -
A great opportunity for a Quantum Consultant to support expert witness work on major construction disputes in London (hybrid/remote).
Read more » -
An excellent opportunity for a Senior Quantum Consultant to support expert witness commissions on major construction disputes, based in London (hybrid/remote).
Read more » -
An excellent opportunity for a Quantity Surveyor to specialise as a Quantum Consultant within a leading London-based claims and disputes consultancy.
Read more » -
An excellent opportunity for an experienced Delay Analyst to join a growing, London-based specialist claims and disputes consultancy.
Read more » -
New Senior Consultant role in London (hybrid-working) for a Quantity Surveyor looking to specialise their career in construction disputes.
Read more » -
A great opportunity for a Quantity Surveyor / Commercial professional – or an existing disputes consultant – to join a specialist commercial and contract management consultancy in London as a Consultant – Commercial & Quantum, with clear scope to progress.
Read more » -
An exciting opportunity for an experienced planner to specialise in Delay Analysis with a specialist claims and disputes consultancy based in London.
Read more » -
A Senior Delay Analyst role exists for a construction planner with strong exposure to delay analysis. The position is to work within a specialist claims and disputes consultancy based in central London.
Read more » -
Associate Director technical expert witness role with a multidisciplinary, global consultancy with a London office offering remote working.
Read more »