35 Quantum Delay Claims and Dispute jobs in London
London Quantum Delay Claims and Dispute Keywords: Quantity Surveyor £60,000 to £149,999 Page 1 of 4 1 2 3 4 »-
A Quantum Expert is required to join a large multidisciplinary consultancy in their a prestigious, globally recognized consultancy in their growing London office.
Read more » -
A new Associate Quantum Director job in the construction sector to join a premium and large multidisciplinary consultancy in their London office (hybrid-working).
Read more » -
A Director - Project Advisory and Recovery job vacancy in the construction consultancy sector to join a large multidisciplinary consultancy in their London office with working from home flexibility.
Read more » -
An exciting Quantum Director job in the construction sector to join a large multidisciplinary consultancy in their London office.
Read more » -
A fantastic opportunity for a Associate Director in Quantum to join within the Quantum division of an international and prestigious expert witness consultancy headquartered in Central London.
Read more » -
Senior Chartered Building Surveyor Expert Witness role focused on defect analysis and construction disputes.
Read more » -
A great opportunity for a Quantum Consultant to support expert witness work on major construction disputes in London (hybrid/remote).
Read more » -
An excellent opportunity for a Senior Quantum Consultant to support expert witness commissions on major construction disputes, based in London (hybrid/remote).
Read more » -
An excellent opportunity for a Quantity Surveyor to specialise as a Quantum Consultant within a leading London-based claims and disputes consultancy.
Read more » -
New Senior Consultant role in London (hybrid-working) for a Quantity Surveyor looking to specialise their career in construction disputes.
Read more »