72 Quantum Delay Claims and Dispute jobs in London
London Quantum Delay Claims and Dispute Keywords: expert witness £60,000 to £149,999 Page 3 of 8 « 1 2 3 4 5 ... 8 »-
A fantastic opportunity for a Associate Director in Quantum to join within the Quantum division of an international and prestigious expert witness consultancy headquartered in Central London.
Read more » -
Associate Director Forensic Planning job vacancy in the construction sector to join a large multidisciplinary consultancy in their London office.
Read more » -
Senior Chartered Building Surveyor Expert Witness role focused on defect analysis and construction disputes.
Read more » -
A great opportunity for a Quantum Consultant to support expert witness work on major construction disputes in London (hybrid/remote).
Read more » -
An excellent opportunity for a Senior Quantum Consultant to support expert witness commissions on major construction disputes, based in London (hybrid/remote).
Read more » -
An excellent opportunity for a Quantity Surveyor to specialise as a Quantum Consultant within a leading London-based claims and disputes consultancy.
Read more » -
An excellent opportunity for an experienced Delay Analyst to join a growing, London-based specialist claims and disputes consultancy.
Read more » -
New Senior Consultant role in London (hybrid-working) for a Quantity Surveyor looking to specialise their career in construction disputes.
Read more » -
A Senior Delay Analyst role exists for a construction planner with strong exposure to delay analysis. The position is to work within a specialist claims and disputes consultancy based in central London.
Read more » -
Associate Director technical expert witness role with a multidisciplinary, global consultancy with a London office offering remote working.
Read more »